CAPABILITIES
& SERVICES
OUR SERVICES
CNC MACHINES
HUTCHINS BROS ARE COMMITTED TO CONTINUAL IMPROVEMENT AND ENHANCING OUR OPERATIONS. WE HAVE IMPROVED OUR OUTPUT AND PRODUCTIVITY THROUGH THE INTEGRATION OF AUTOMATED PLATE AND BEAMLINE PROCESSSING, AND ROBOTIC WELDING.
-
Kinetic 1200
Installed in 2019, our Kinetic 1200, is a high-performance, plasma plate-processing machine. It allows us to cut and process steel plates up to 50mm, efficiently and accurately, reducing handling time and improving workflow. The Kinetic allows us to quickly produce complex parts, while maintaining precision and consistency.
-
Python X Beamline
The Python X Beamline allows for the efficient and consistent processing of steel beams, angles, and channels. Commissioned in 2011 as the first stage of our automation program, The Beamline automates multiple operations in one setup - cutting to length, coping, notching, drilling, and part marking. It streamlines fabrication by reducing material handling and improving accuracy, helping us efficiently produce complex components.
-

AGT Robotics BeamMaster
HBE installed the BeamMaster in 2022, an advanced robotic welding system, automating the welding of structural steel assemblies. Using intelligent vision and adaptive technology, the BeamMaster identifies part geometry and applies accurate welds without the need for manual programming. It improves efficiency, reduces handling, and ensures high-quality welds across complex assemblies.
-

IMET KTECH 502 Bandsaw
Our most recent addition, implemented in 2024, the IMET KTECH 502 F200 is a fully automatic double-column bandsaw designed for precision cutting of structural steel. Offering programmable cutting cycles, high accuracy, and efficient handling of large profiles and bundles, the Bandsaw achieves clean cuts on RHS, SHS & CHS profiles, improving productivity and reducing manual effort.
OUR FACILITIES
18,000sqm facility including:
1,400sqm workshop
1,100sqm paint shed
6m x 5m x 21m Sand Blasting Booth with recovery system
Bandsaw Shed
Beamline Facilities
7,500sqm dedicated storage facility
OUR EQUIPMENT
Our equipment & machines include:
3 x 5t overhead cranes
1 x 10t overhead crane
2 x mobile cranes
2 x loaders
1 x 7t Komatsu forklift
1 x 5t Komatsu forklift
1 x 2.5t Hangcha forklift
1 x 3T Merlo Telehandler
ENVIRONMENTAL, QUALITY & SAFETY COMMITMENT